Kuvamateriaali on havainnollistava
Pidätämme oikeuden muutoksiin
RDT-07-0121
35
®
NORD
fire
|
FDMB
Fig. 45 Gypsum wall construction- installation next to wall, ceiling- mortar or gypsum and
mineral wool
EIS 90
Position:
1 Fire damper
2 Mortar or gypsum
3 Mineral stone wool min. density 140 kg/m³
Notice:
•
Gap between damper and construction is filled by mortar or gypsum and mineral wool
•
Wool is fixed to damper body and construction by fire protection mastic
•
Mineral wool thickness = construction thi 20 mm or 50 mm
•
Installation is valid for ceiling construction
Shown schemes of incorporation and damper are illustrative only!
Installation opening has to be
reinforced by profile (UW, CW).
Profil is fixed by screws ≥3,5 mm
with corresponding length. Distance
between screws ≤200 mm.