Model 5503 Compact Chamber
–
Operating Manual
D01307 Revision B - 2021-03-16 - Page
6
of
20
III. Setup Guide
Part 1: Environmental Chamber Unpacking and Setup
Step 1
– Unpack and inspect
NOTE: When handling the chamber DO NOT use any
of the fittings or the door handle as a grip or for
leverage. Lift the chamber by placing your hand all
the way into the glove port and grabbing hold of the
chamber wall or gripping around the outside of the
chamber.
Unpack the Control Unit and inspect for visible
damage. If no damage is observed then proceed to
the next step.
Step 2
– Set the chamber in place
Place the chamber on a clean, level bench area.
If the unit was ordered with a heating/cooling unit
installed, it is recommended to allow for 2 feet of open
space behind the chamber for ventilation. Less space
will impact heating/cooling performance.
Step 3
– Arrange components
Connections for humidity and gas are on the left side
of the chamber to the left of the door. Place
component systems near the connections.