Model 5506 Mid-Size Chamber
–
Operating Manual
D01332 Revision B - 2021-03-16 - Page
6
of
20
III. Setup Guide
Part 1: Environmental Chamber Unpacking and Setup
Step 1
– Unpack and inspect
NOTE: When handling the chamber DO NOT use any of
the fittings or the door handle as a grip or for leverage. Lift
the chamber by placing your hand all the way into the glove
port and grabbing hold of the chamber wall or gripping
around the outside of the chamber.
Unpack the Control Unit and inspect for visible damage. If
no damage is observed then proceed to the next step.
Step 2
– Set the chamber in place
Place the chamber on a clean, level bench area.
If the unit was ordered with a heating or cooling unit
installed, be sure to leave approximately 2 feet of
open space behind the chamber for ventilation.
Step 3
– Arrange components
Connections for humidity and gas are on the left side
of the chamber to the left of the door. Place
component systems near the connections.