background image

3

Fasten the screws into the 

wall plugs. 

4

Installation of E-GENESIS 1

Drill holes based on both 

markings  on  the  wall. 

Use  Concrete  drill  bit  Ø 

5.5mm.

Measure 55mm from the 

top  of  the  track  and  do 

marking for drilling.

Repeat  step  3  and  4  on 

the other end. 

Measure 40mm from the 

side of the edge.

Mark  out  the  guides  on 

both end.

Place the E-GENESIS 1 on 

the  wall  and  use  a  level 

to  ensure  a  horizontal 

alignment. 

Insert  wall  plugs  into  the 

drilled holes. Use a mallet 

if necessary.

2

5

6

7

DMK

-00

5-0

24

-01 ENG

1

Wiring Instructions

1) Do not perform in damp environment.    

2) If in doubt, please consult a qualified electrician.

10mm

10mm

50mm

40mm

Live (Brown or Red)

Earth (Green or Green/Yellow)

Neutral (Blue or Black)

Prepare leads as shown:

Live Terminal

Earth Terminal

Neutral Terminal

Live Indicator

Neutral Indicator

Drilling Measurement

40mm

40mm

55mm

55mm

Drill here

wall

Back View

Front View

Drill here

Drill  on  the  circular  markings  using  a  5.5mm  concrete  drill  bit  (not 

included).

FIG. 3

Marking & Drilling Measurement Overview

Length of E-GENESIS 1

Technical Specifications

Rated Voltage                :  250 V a.c. Single-phase
Rated Current                 :  13 / 16 Amp maximum
Frequency                   :  50Hz / 60Hz
Rated Impulse Withstand Voltage      :  4000 V a.c.
Connection of Adaptor or Tap-off Unit  :  Intended to be connected and
                          disconnected when system is
                          energised and with a load
                          connected 
Terminal Connecting Capacity

Live, Neutral & Earth             :  Rigid 2.5mm

2

 to 6mm

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Flexible 1.25mm

to 2.5mm

                          (16Amp)
Ambient Operating Temperature      :  -5

o

C  to 45

o

C (not to exceed an 

                          average of more than 35

o

C in

                          any 24 hours period)
Maximum Installation Altitude        :  2000 meters
Resistance to Impact             :  Heavy Impact
Degree of Protection             :  IP4X
Degree of Pollution              :  2 (Non-conductive pollution with 

                          temporary conductivity caused

                          by condensation)
Track Material                :  Aluminum
Insulation Material              :  Polycarbonate
Dimension (Height x Depth)                :  100mm x 28.5mm
Weight                    :  Estimated 1.8kg (1000mm)
 

INSTALLING PARTY

All Power Tracks must be installed by a qualified 

electrician.

USE OF EARTH LEAKAGE CIRCUIT BREAKER(ELCB)

It is a mandatory requirement that all installations 

of electrical power source must be connected to an 

ELCB to provide protection against overload, short 

circuits and earth leakages faults. Failure to comply 

can be hazardous.

INSTALLATION LOCATION

All Power Tracks must be installed at location that 

complies  with  safety  rules  and  regulations  of 

respective country.

INSTALLATION SURFACE

All Power Tracks must be installed on flat surface.

RECOMMENDED INSTALLATION CLEARANCE

Refer to 

FIG.1 & 2

 

on the right for more information 

on  the  minimum  clearance  (from  the  floor  or  any 

furniture  fixtures)  required  for  ‘twist-on’  adaptors 

and accessories.

PLEASE READ BEFORE INSTALLING

Minimum Clearance for E-GENESIS 1 Installation

FIG. 1

Minimum clearance of 25mm from the bottom required.

FIG. 2

Minimum clearance of 20mm from the top required.

25mm

20mm

CEILING/CABINET

Product Orientation

V-GROOVE

‘UP’ Indicator

Adaptors are 

not

 to be 

inserted within this region.

Adaptors are 

not

 to be 

inserted within this region.

Product Overview

E-GENESIS 1

Pre-wired with 3m of 

1.5mm² 3-core cable

Screw

Mounting Peg

Side View

Side View with adaptor

Screw Cap

Keep away from fire.

Keep away from water.

Not for outdoor use.

To be installed by a

qualified electrician/

installer.

CAUTION

Align and hook the openings on the rear side of the E-GENESIS 1 with the screws on the wall. 

Apply a downward force to secure the track.

2mm

8

Leave  2mm  gap  between 

the  screw  head  and  the 

wall surface for mounting.

9

10

11

Force

FLOOR/HOME FIXTURE

Reviews: