Instruction Manual ZHK
10/129
V07-19.0
2 Safety instructions / Guidelines to conformity to laws and directives
2.1
CE-conformity / installation instructions for safe operation
2.1.1
CE-conformity / incorporation declaration according to Machinery Directive
2006/42/EC
An AHU (or any part thereof) supplied by EUROCLIMA is by definition of Machinery Directive
2006/42/EC an incomplete machine, because it is limited in function and is only a part of the build-
ing system. Accordingly, for a safe operation before the initial start-up, the general in
chapter 2.1.2
(Installation instructions for the proper installation in the building system)
and in particular in
the following chapters described on-site work must be carried out for a safe operation.
Depending on the scope of supply, a CE-conformity declaration or a declaration of incorporation
will be issued. A declaration of incorporation will be issued, if supplementary work on site is neces-
sary to gain the CE-conformity. This applies if no frequency converter, which is necessary, or no
filter manometer is included in delivery (see
chapter 2.4
2.1.2
Installation instructions for the proper installation in the building system
For the proper installation of AHU equipment and the safe operation of the system, depending on
the configuration of the AHU, before the first start at least, the following points must be imple-
mented or upgraded and is the responsibility of the client:
Assembly of delivery sections
The delivery sections of the AHU must be assembled and linked together, according to the drawing
supplied on the inner face of fan section door. See the
chapter 4 (Foundation / erection)
.
Secure inlet and outlet openings
All the inlet and outlet openings must be connected to ducts or respectively equipped with grilles,
to prevent persons accessing from the outside to moving parts (such as fan wheels) during opera-
tion.
Main switch
See
chapter 7.3 (EC motors
Installation of ceiling AHUS
–
flat AHUs
See
chapter 4.2.4 (Special guidelines for flat AHUs
.
Installation of filters
See
chapter 5.4 (Airfilters)
.
Temperature limitation
Ensure that a control system is fitted and that the AHU is only operated with a supply air tempera-
ture below the allowable maximum (see
chapter 1.2.1 Intended use
, when not stated otherwise in
the technical data). For this purpose, the continuous monitoring of the supply air must be ensured
on site.
Measures regarding noise attenuation
As a basis for on-site sound measures calculation (such as for sound attenuators) the on request
available sound data can be used. For information regarding the emitted sound power level over
the openings see the technical data sheet, which is available on request
–
refer to
chapter 10
Information on airborne noise emitted by the AHUs - on request)
.
Summary of Contents for ZHK Series
Page 1: ...ZHK INSTRUCTION MANUAL ...