Instruction Manual ZHK
16/129
V07-19.0
Filter change indicator
If one or more filter stages belong to the AHU equipment, then they have to be equipped with an
optical display or an acoustic warning in the controlling. They will be triggered if the pressure drop
at the filter exceeds the maximum permissible value. See
chapter 9.3 (air filters).
If above mentioned equipment is not included in delivery by EUROCLIMA, it has to be provided on
site.
2.5
Staff selection and qualification
All persons, who are authorized to work on the air conditioner, must have read and understood the
complete manual - in particular
chapter 2 (Safety instructions)
. Until this task is completed, the
person may not begin to work on the AHU.
All work must be carried out by professionals who have sufficient technical training, experience and
sufficient knowledge of…
-
Locally applicable safety and occupational health rules
-
Locally valid accident prevention regulations
-
Locally applicable standards and approved rules of practice.
All professionals have to recognize and assess the work appropriately and recognize and avoid po-
tential hazards.
Execution of the assembly, installation, electrical connection, commissioning and disposal:
-
by qualified electricians and AHU technicians.
Execution of maintenance / monitoring of the operation:
-
by technical staff or trained personnel and qualified electricians and AHU technicians.
Work on optionally installed refrigeration components must be performed only by trained techni-
cians and according to EU-directive 303/2008 certified refrigeration technicians.
Subsequently, warning triangles indicate warnings that must be adhered to minimize risks to per-
sons who are entrusted with the work on the air conditioner.
3 Reception control / unloading / transportation to installation site
Note:
Chapter 3.2 (Lifting by forklift / lift truck)
,
chapter 3.3 (Overlifting of AHU sections with
and
chapter 3.4 (Overlifting of monoblocs)
do not apply to flat AHUs (ceiling
AHUs), since they are not equipped with base frame.
3.1
Reception control
-
Upon arrival of the equipment, please check immediately the package for completeness and
any damage.
-
Loose supplied parts and assembly materials are in a nylon bag or a box in the AHU.
-
If damages are found, immediately complete a damage report and send it to EUROCLIMA.
Only then the transport company can make the claim with the insurer (Note damage on the
shipping documents with date and signature in the presence of the carrier). Complaints about
apparent damaged or missing parts of the delivery cannot be subsequently recognized, if pro-
cedures are not followed. In case of complaints please inform immediately the EUROCLIMA
office.