Instruction Manual ZHK
V07-19.0
45/129
1. at the base frame cover / base frame valance above
2. at the base frame frontside
3. sealing of the base frame and to the roof profile (at two-storey AHUs)
4. sealing of open base frame holes (if present)
5. at the joints of the base frame covers
After assembling the entire sealing has to be checked.
Figure 84:
Sealing of the base frame cover
At AHUs in outdoor execution, an additional separation bar (included in the scope of delivery) must
be mounted at the separation positions at the roof flange, see
Figure 85:
Mounting of the sliding bar
5
1
2
4
3
Summary of Contents for ZHK Series
Page 1: ...ZHK INSTRUCTION MANUAL ...