Instruction Manual ZHK
68/129
V07-19.0
Figure 159:
Mounted clamps
5. Installation of threaded strut
The threaded strut is mounted on the pressures side and holds the pressure side tube in position,
in order to relieve the pressure side flexible tube connection from axial forces. The strut shall be
fixed near to the vertical tube coming from the pump pressure side as shown in
For installing the threaded strut, the following parts are needed (included in the scope of supply by
EUROCLIMA),
1. Clamp for threaded strut
2. Threaded strut (M10)
3. Base support for strut
Figure 160:
Position and parts for installing the strut
To install the threaded strut, proceed as follows:
-
Fix the clamp for the strut at the upper horizontal tube near to the vertical pump coming from
the pump.
-
The base support shall be installed vertically under the upper clamp. (For spray humidifier
equipped with UV water treatment, a small discrepancy may be possible.)
-
Cut the threaded rod to the required length and fix the rod accordingly. (For spray humidifier
equipped with UV water treatment, the rod may be bent to pass the UV circuit tubes).
-
Tighten the lower nut and the counter nut in order to tie down slightly the tube assembly.
In case of problems or needing support with your product, do not hesitate to contact EUROCLIMA
for any further clarification.