00081787.DOCX, Version 1.0
25/34
You must only use safety bonds and quick links complying with DIN 56927, shackles complying with DIN EN
1677-1 and BGV C1 carbines. The safety bonds, quick links, shackles and the carbines must be sufficiently
dimensioned and used correctly in accordance with the latest industrial safety regulations (e. g. BGV C1,
BGI 810-3).
Please note:
for overhead rigging in public or industrial areas, a series of safety instructions have to be
followed that this manual can only give in part. The operator must therefore inform himself on the current
safety instructions and consider them.
The manufacturer cannot be made liable for damages caused by incorrect installations or insufficient safety
precautions!
Pull the safety bond through the attachment eyelet and over the trussing system or a safe fixation spot.
Insert the end in the quick link and tighten the safety screw.
The maximum drop distance must never exceed 20 cm.
A safety bond which already held the strain of a crash or which is defective must not be used again.
Adjust the desired inclination angle via the mounting bracket and tighten the fixation screws.
Attachment
Before attaching the device, make sure that the installation area can hold a minimum point load of 10 times
the device's weight.
The device must only be installed absolutely planar at a vibration-free, oscillation-free and fire-resistant
location. Make sure that the device is installed absolutely planar by using a water-level.
The device must be installed out of the reach of people.
The device must always be installed via all fixation holes. Do only use appropriate screws and make sure
that the screws are properly connected with the ground.
The durability of the installation depends very much on the material used at the installation area (building
material) such as wood, concrete, gas concrete, brick etc. This is why the fixing material must be chosen to
suit the wall material. Always ask a specialist for the correct plug/screw combination indicating the maximum
load and the building material.
Procedure:
Step 1:
The holes for the installation are on the mounting brackets.
Step 2:
Hold the mounting brackets onto the location where the device is to be installed.
Step 3:
Mark the boreholes with a pen or a suitable tool.
Step 4:
Drill the holes.
Step 5:
Hold the mounting brackets in the desired position and tighten it.
DANGER TO LIFE!
Before taking into operation for the first time, the installation has to be approved by an expert!
DANGER TO LIFE!
Before taking into operation for the first time, the installation has to be approved by an expert!