Hub van Doorneweg 8 • 2171 KZ Sassenheim – NL •
T
+31(0)252 228850 •
F
+31(0)252 228235 •
E
sales@euronorm.nl •
I
euronormdrives.com
26
27
NEURN030000_220_A
NEURN030000_220_A
6.7 Commissioning
Chapter 4 Installation and commissioning
50
Cha
pt
er 4
4-7.
Commissioning
F0.00=?
Correctly set motor and
encoder parameters
Vector control W/PG
V/F
1
2
Select command source
Select suitable frequency
source
Start motor to run,observe the
phenomenon,if abnormal,please
refer to the troubleshooting
End
Select motor start-up mode
Control
NO
YES
Achieve the required
control effect?
0
Vector control W/O PG
Select motor stop mode
Correctly motor parameters
Motor parameter self-learning
Commission-
ing
Select control manner
(setting F0.00)
(Set b0.00-b0.05,b0.28,etc)
(Set b0.00-b0.05)
Select appropriate
ac/deceleration time
(Set F0.13,F0.14)
Select appropriate
ac/deceleration time
(Set F0.13,F0.14)
(Set b0.27)
Motor parameter self-learning
(Set b0.27)
(Set F0.11)
(Set F0.03,F0.04,F0.07,etc)
(Set F3.00)
Select appropriate
ac/deceleration time
(Set F0.13,F0.14)
(Set F3.07)
Figure 4-23
:
Commissioning
●
Firstly confirm that AC input power supply voltage shall be within inverter rated input voltage
range before connecting power supply to the inverter.
●
Connect power supply to the R, S and T terminals of the inverter.
●
Select the appropriate operation control method.
Commissioning
• Firstly confirm that AC input power supply voltage shall be within inverter rated input voltage range before connecting
power supply to the inverter.
• Connect power supply to the R, S and T terminals of the inverter.
• Select the appropriate operation control method.