Page 6
Installation
PVVEX58-300
Vertical Power Vent
PVHEX58-300
Horizontal Power Vent
PVHFL58-300
Horizontal Power Vent
Flush/Louvered
Control Panel
Wall Switch
On/Off
(not supplied)
Fireplace Light
Switch or Dimmer
(not supplied)
115 VAC 60 Hz
supply from
distribution panel
Fireplace
Power Vent Control Cable
(Not supplied
,
o
rder required
length from your
d
ealer)
Appropriate
European Home
Venting
Components 5" x 8"
(not supplied)
Steel Stud Kit
(supplied)
Non-Combustible
Wall Board Facing
(supplied)
Light Wiring
(not supplied)
Control Box Cable
30' supplied standard
20' low voltage wire supplied
Figure 2.
M
ajor
C
omponents
Introduction
Introduction to the
Milan II
Fireplace:
The complete system will require a firebox, a power vent
termination, an electrical control panel, and a vent system.
There are 3 different power vent terminations available
depending on your installation requirements. Each power vent
requires a control cable to be installed between the power vent
and the control panel. Review the installation sequence on
page 7 for general information on preparing for a successful
installation of your fireplace.
The
Milan II
fireplace is not
intended to be used as a primary heat source and should
not be connected and operated with a thermostat switch.
Summary of Contents for MILAN II
Page 43: ...Page 43 Notes ...