21
FACING
After the gas supply has been routed and the
venting has been installed, the front wall or
face can be finished.
Non-combustible material must be used in the
gray area shown in Figure 14.
Conventional drywall may be used
OUTSIDE
of this area.
The joints can be finished with conventional
joint compound and fiberglass mesh joint
tape. See Figure 15, below.
Figure 15
Figure 14
38½”
49”
Non-combustible material such as stone or
tile may be used as a facing. See Figure 16,
below.
Figure 16