EVCO S.p.A.
Vcolor 869/879
| Installer manual ver. 2.2 | Code 144VC869E214
page 39 of 94
The sanitation cycle starts with the blast chilling phase. When the temperature recorded by the needle probe reaches
the temperature to end blast chilling, the device will move on automatically to holding.
The temperature to end blast chilling (set by r20) is also the working set point during holding.
When the holding period has elapsed, the device will move on automatically to conservation.
The probe insertion test is always carried out at the beginning of the cycle: if the test is not completed, the buzzer
sounds and the cycle is interrupted.
During blast chilling the device shows the temperature recorded by the needle probe, the cabinet temperature and the
time elapsed since the start of the blast chilling process.
The cycle may be interrupted early by pressing the
key.