Prior  to  the  electric connection,  the  heater  must  be  obligatorily  filled  with  water.  By 
first  filling  the  faucet  for  the  hot  water  upon  the  mixing  tap  must  be  opened.  The 
heater is filled with water when the water starts to run through the outlet pipe of the 
mixing tap. If the heater at connection would not be filled with water, at first switching-
on the damage of thermal fuse shall occur and the heater shall not operate at all. 
 

CONNECTING THE WATER HEATER TO 
THE POWER SUPPLY NETWORK 

 
Connection of the water heater to the electric network must be performed according 
to standards for electric installation. The heater shall be connected to electric power 
supply over electric cable with plug. If the built-in cable shall be replaced with a new 
longer,  the  built-in  cable  may  be  removed  and  the  new  connecting  cable  inserted 
where the cable wires shall be screwed to the connection terminal. In order to do this 
the plastic lining of the water heater must be removed. This is done so that at first the 
plate is removed, inserted in the front side of the plastic lining. The plate is released 
so  that  in  the  slot  between  the  inserted  plate  and  the  plastic  lining  at  first  at  the 
thermostat  knob  and  on  the  side  in  front  of  the  knob  cautiously  a  screwdriver  is 
pushed in. When the plate is released at both sides, it can than be removed by hand. 
Than the thermostat knob is removed and the screw under the knob is unscrewed. At 
last  also  all  four  screws  for  fixing  of  plastic  lining  are  unscrewed  and  the  lining 
removed. 
  
Legend: 
1 - Thermostat 
2 - Thermal cut-off 
3 - Electric heating element 
4 - Pilot lamp 
5 - Connection terminal 
  
L - Live conductor 
N - Neutral conductor 

 - Earthing conductor 

 

 

 

 

 

 

 

Electric installation 

Summary of Contents for TEG 0520 O/A

Page 1: ...TEG 5 10...

Page 2: ...Wasser zu f llen Sollten Sie den Warmwasserbereiter vom Stromnetz trennen m ssen Sie im bei Frostgefahr das Wasser aus dem Kessel entleeren Bitte versuchen Sie nicht eventuelle Fehler am Ger t selbst...

Page 3: ...anschlie en Eingriffe in das Innere zur Reparatur Beseitigung des Wassersteines darf nur bevollm chtigter Kundendienst ausf hren INSTALLATION Der Warmwasserbereiter ist entsprechend seinen Einbaumasse...

Page 4: ...stem ist Wenn der Druck im Wasserleitungssystem h her als 5 Bar ausmacht ist vor die Mischbatterie noch ein Reduktionsventil anzubringen Bei der Auswahl der Mischbatterie sollten Sie besonders auf die...

Page 5: ...ingebaute Kabel zu beseitigen und das neue in die Kabeleinf hrung und die Kabeldr hte in die Anschlussklemme zu fixieren Daf r muss zuvor die Kunststoffverkleidung des Warmwasserbereiters abgenommen w...

Page 6: ...n der Mischbatterie h rt das Tropfen nicht auf sondern wird nur die Mischbatterie besch digt Sollte der Warmwasserbereiter l ngere Zeit nicht in Betrieb sein sch tzen Sie den Inhalt vor dem Einfrieren...

Page 7: ...A TEG 1020 U A Angegebenes Lastprofil XXS XXS XXS XXS Energieeffizienzklasse 1 A A A A Warmwasserbereitungs Energieeffizienz wh 1 35 2 35 35 3 35 1 J hrlicher Stromverbrauch 1 kWh 525 527 523 525 T gl...

Page 8: ...t be filled with water If the heater is to be disconnected from the power supply please drain any water from the heater to prevent freezing Please do not try to fix any defects of the water heater on...

Page 9: ...ter e g lime removal must be carried out by an authorised maintenance service provider INSTALLATION The water heater shall be built in according to the drawing and table with dimensions in a premise w...

Page 10: ...water in the network runs short If the pressure in water supply network surpasses 5 bar before the mixing tap also a reduction valve must be built in By choice of the cross flow mixing tap particular...

Page 11: ...ew longer the built in cable may be removed and the new connecting cable inserted where the cable wires shall be screwed to the connection terminal In order to do this the plastic lining of the water...

Page 12: ...he mixing valve the dropping can not be stopped but the mixing valve can be damaged When the heater shall not be used during a longer time its contents must be protected against freezing so that the e...

Page 13: ...020 U A Declared load profile XXS XXS XXS XXS Energy efficiency class 1 A A A A Water heating energy efficiency wh 1 35 2 35 35 3 35 1 Annual electricity consumption 1 kWh 525 527 523 525 Daily electr...

Page 14: ...branch du r seau il devra tre vid d eau en raison du risque de gel Vous ne devez jamais essayer de r parer le chauffe eau vous m me mais faites appel au service d assistance technique le plus proche...

Page 15: ...le service apr s vente autoris peut proc der aux interventions l int rieur de chauffe eau en vue de sa r paration ou du d tartrage INSTALLATION Installez le chauffe eau conform ment au sch ma et au ta...

Page 16: ...eau ne s coule pas de la chaudi re en cas de panne du r seau d eau Si la pression dans le r seau de distribution d eau est sup rieure 5 bar une vanne de r duction de pression doit tre int gr e en amo...

Page 17: ...ue au moyen d un c ble de raccordement Si vous voulez remplacer le c ble livr par un c ble nouveau plus long vous pouvez le supprimer et fixer le nouveau c ble dans une presse toupe et visser les fils...

Page 18: ...le robinet mitigeur vous ne pouvez pas pr venir cette fuite mais vous risquez d endommager le mitigeur Si vous n utilisez pas l appareil pendant un certain temps il ne faut pas le d brancher du r sea...

Page 19: ...S Classe d efficacit nerg tique A A A A Efficacit nerg tique de chauffage d eau wh 1 35 2 35 35 3 35 1 Consommation annuelle d nergie lectrique 1 kWh 525 527 523 525 Consommation journali re d nergie...

Page 20: ...08 2015 247145...

Reviews: