EVER POWERLINE RT PLUS 6000 / 10000 UPS Operating Manual
51
Pomoc Techniczna, tel.: +48 61 6500 400
2020-03-20 13:06
Installation of the management card
1. Switch the unit off.
2. Switch the UPS unit's input protections.
3.
Wait around 30 seconds (time needed for unloading the unit’s internal capacity).
4. Remove the card slot cover (fig. 43a).
5. Insert the card into the chamber (fig. 43b i 43c).
6. Install the card cover to the rear panel (fig. 43d).
7. Switch the UPS unit's input protection.
8. Start the UPS.
Fig 43: Installation of the management card
Summary of Contents for POWERLINE RT PLUS 10000
Page 1: ......