Solar Eye User Manual V1.0
Page 10 of 24
Fig2-12 Remove Solar Eye from base
Warning: When remove the base, there should be no force in case of
mechanical damage.
2.4.2 Wall Mounting
1
)
Drill two
φ
6 holes with 43mm space distance. Fig 2-13 as below:
Fig 2-13
Drill the wall mounting holes
Warning: Stay vertical angle between driller and wall with no shake in
case of incline. The hole should be no less than 30mm deep. When
measure the hole depth, clear the dust inside.
2
)
Place the wall plugs into the holes with the rubber hammer.
3
)
Wring the screws ST3×25 into wall plugs, and keep the screw head 5mm