INSTALLATION OF THE BATTERY BACK-UP
When choosing the installation spot you must take the device's weight into account.
The back-up should only be used in rooms where dustiness, temperature and
moisture levels conform to the device's specification. In order to ensure correct
operation of the back-up, appropriate cooling conditions for the device must be
provided. For this reason the ventilation openings on the back-up's case must be
uncovered and the distance between the back-up and other objects should not be
lower than 30 cm.
WARNING! The device must not be installed close to flammable
materials!
Before positioning the battery back-up two additional installation grips need to be
mounted in order to ensure stability of the device and enable fixing it to the floor. To
this end please remove the 4 M8 screws located in the central section of the device’s
bottom side. Gently tilt the battery back-up and place the grips. Next, screw the grips
down to the UPS with the screws previously removed.
Figure 10: Installation grips
Detailed information may be found in a separate document containing installation
guidelines, delivered with the device.