DANGER!
Figure 19
ENSURE POSITION OF THE CARRIER.
Do place the carrier on the even flat ground during the
operation. If not, there is a danger the carrier may fall down
and turn upside.
DANGER!
Figure 20
CHECK UNDERGROUND PIPING.
Check demolition job is being done over the area where high-
pressure piping or similar gas piping was laid out. High-
pressure gas piping can be explosive at damage.
WARNING!
IMPORTANT!
Figure 21
DO NOT USE FOR TRANSPORT PURPOSES.
The hydraulic grab is not intended to hoist or tow any object.
To do so can bring out the risk of unexpected turning upside-
down and the damage in the grab.
WARNING!
Figure 22
DO NOT OPERATE TO EITHER SIDE OF THE
CARRIER WITH THE BOOM AND ARM EXTENDED.
This can make a danger of the carrier fall over.