Document No. 1112M001 Revision 1.8 Date: June 2013
10
3.0 Unpacking the Wind Turbine
A Packing list is packed with the product. Ensure that all parts are
present. Notify your dealer of any shortages.
The e400nb is contained in one shipping crate. Check the crate for any
transit damage and then carefully remove the top of the crate to reveal
the contents. Check that everything is intact. Pay special attention to
the blade package. Carefully remove all the parts for safe storage. The
last item to be removed is the generator assembly, which is fully
secured to the packing case base.
IMPORTANT NOTE:
Do not lift or maneuver the generator
USING THE NOSE CONE PILLARS.
This will damage the pillars and cause
unbalance.