Document No. 1112M001 Revision 1.8 Date: June 2013
3
Index
1.0 Safety Warnings and Notes
4
1.1 Safety Symbols
5
1.2 Turbine Operating Procedures
6
2.0 The Tower
8
2.1 Mounting Flange and Tower Top
9
3.0 Unpacking the Wind Turbine
10
4.0 Turbine assembly and Installation
12
4.1 Identification Marking
12
4.2 Tail Assembly
13
4.3 Generator to the Tower with Damper Kit
14
4.4 Tail Boom Weld assembly to the Generator
16
4.5 Tail Assembly to the Boom
17
4.6 Blades and Nosecone Stiffener Ring
19
4.7 Mechanical Brake Assembly
20
4.8 Nacelle and Nosecone
23
5.0 Electrical Installation
24
5.1 Lightning Protection
24
5.2 Earthing (Grounding)
25
5.3 Cable Sizes and Installation
25
5.4 Electrical Installation (e400nb 250Vdc and Grid Tie)
27
5.5 Electrical Installation (e400nb 48Vdc and MPPT Charge Control) 28
5.6 Electrical Installation (e400nb 110Vdc, limiter and MPPT)
30
6.0 Installation Commissioning
31
7.0 Maintenance Schedule
32
7.1 Wind Power Class
32
7.2 Planned Maintenance Schedule
33
8.0 Questions and Answers
34
9.0 Technical Specification
35
10.0 Compliance
36
11.0 Warranty
37
12.0 Annexures
Annexure 1
General Information
38
Annexure 2
Choosing a Site
41
Annexure 3
Grid Tie Inverters
43
Annexure 4
Manual Brake Operation
44
Annexure 5
Brake Fitment Instructions
45
Annexure 6
Power One Aurora Settings
54
Revision History
Revision
Date
Comments
Author
1.8
06/13
Add SWCC Logo, technical specification and Annexure 6
J. Carpy
1.7
12/12
Revised technical specification
B.Singh
1.6
11/12
Blade fitment guide improved, brake fitment added
J. Carpy
1.5
09/12
MCS Logos added, blade bolts reversed, brake cable turns
J. Carpy
1.4
07/12
Add sect. 1.2 Operating procedures, revise maintenance
J. Carpy