background image

14 

2. Wipe  off  the  silicone  sealing  bar  gasket  on

the bell-lid (Fig 8.2) every day with a damp

cloth and mild detergent.

(Fig 8.2) 

Silicone Sealing Bar Gasket on the 

bell-lid 

3. Replacement of the Silicon Sealing Bar

Gasket on the Bell-Lid (Fig 8.2).

Inspect  the  silicone  sealing  bar  gasket  for 

wear.  If  it  is  worn,  it  will  cause  the  clear 

chamber  bell-lid  to  pop  open  on  its  own, 

affecting the vacuum sealing of the product 

and it must be replaced. To replace it, pull it 

from the gasket retainer and make sure the 

retainer is clean of debris. Install the new one 

by pressing in place. Close lid and test for a 

seal.  

4.

Replacement  of  the  Clear  Chamber

Bell-Lid Gasket.

5.

Replacement of Teflon Sealing Bar

The  sealing  bar  needs  to  be  replaced  by  a 

qualified service technician. 

Image 8.3

. Sealing bar teflon 

The silicone gaskets and the Teflon 

sealing bar should be replaced every 200 

working hours, for maximum efficiency. 

The  check  of  pump,  filters  and  electro 

valves must be  done every 2000 working 

hours by authorized personnel only

(Fig 8.3) 

Clear Chamber Bell-Lid Gasket 

Remove the gasket by carefully pulling out the 

gasket from the clear chamber bell-lid     groove. 

Ensure  the  gasket  groove  is  clean  and  free  of 

debris  and  press  a  new  one  in  place.  Close  lid 

and test for a seal.    

Summary of Contents for PrepRite PVS27-6-1

Page 1: ...Vacuum Sealing Machine Operation and Care and Maintenance Manual For PVS27 6 1 PVS32 8 1 PVS32G 8 1 PVS42 12 1 PVS42G 12 2 PVS42GP 12 1 PVS52 25 1 PVS52 25 2 PVS52G 25 2 This appliance is for commerci...

Page 2: ...rstood by all operators and users 1 This appliance must be installed on a stable and level surface 2 DO NOT install this appliance in any area where it may be affected by any adverse conditions such a...

Page 3: ...ersons unplug from the power supply before servicing This appliance must service by qualified service personnel Failure to properly maintain and service to this appliance can and will cause injury or...

Page 4: ...standards regarding the design construction and intended use of the machine will relieve the manufacturer from all liability in the case of damage to personnel or property The manufacturing company is...

Page 5: ...ct itself 4 During the warranty period for any defect in workmanship and material all parts and labor will be covered All warranty claims must be submitted to and conform by all statements and policie...

Page 6: ...ttempt to replace the part This must be performed by a qualified service personnel 7 Always switch off and disconnect the appliance from the power supply before beginning any general cleaning or maint...

Page 7: ...uld light up 3 Set the vacuum time or percentage required the sealing time and the gas injection time if the appliance is equipped with this option 4 Position the bag or bags with product in the chamb...

Page 8: ...s 1 Vacuum cycles are set as described in the chapter Vacuum packaging 2 The SOFT VACUUM option allows the packaging of liquid products 3 All the vacuum packages can be stored in a freezer or cooler C...

Page 9: ...0 Fresh salad parsley 50 50 Yogurt Puff pastry 100 Powdered milk 30 70 Baking powder 100 100 Apples 2 1 97 Sliced bacon 35 65 Sandwich loaf Bread 100 French toast Toasted bread 80 20 Pasta 100 Fresh p...

Page 10: ...air to enter the chamber and allow the lid open During the normal vacuum cycle press the button PUMP GASTRO 6 for 3 seconds to start heating the sealing bar for manual sealing 7 1 1 Control and LCD D...

Page 11: ...g method Press or buttons to choose characters then press SET to move to the next segment By pressing the SET button it is possible to pass over the empty positions and then confirm the set parameters...

Page 12: ...g the chamber is not higher than 14 21 PSI or 1 1 5 bars 4 Printer Label Settings PRINTER OPTION By pressing the SET button the following will appear By using the buttons or it is possible to set the...

Page 13: ...cycle at any time push the ON OFF button for 5 seconds Once the cleaning cycle is complete the screen will revert back to showing the number of programs in use The pump maintenance is not strictly lin...

Page 14: ...Install the new one by pressing in place Close lid and test for a seal 4 Replacement of the Clear Chamber Bell Lid Gasket 5 Replacement of Teflon Sealing Bar The sealing bar needs to be replaced by a...

Page 15: ...e the 2 cables are firmly attached 3 Verify that the distance between the Teflon sealing bar and the silicone sealing bar gasket is at least 125 inches 4 5mm 4 Verify that the Teflon sealing bar is dr...

Page 16: ...16 CHAPTER 10 NAME PLATE AND TECHNICAL DETAILS CONFIGURATION AND CONSUMPTION Image 8 5 Name plate example...

Page 17: ...17 CHAPTER 11...

Page 18: ...18 EXPLODED VIEWS AND PART...

Page 19: ...19 LISTS...

Page 20: ...20...

Page 21: ...21...

Page 22: ...22...

Page 23: ...23...

Page 24: ...24 CHAPTER 12 WIRING DIAGRAMS PVS27 PVS32 PVS32G PVS42 PVS42BG PVS5225 PVS52G...

Page 25: ...25...

Page 26: ...26...

Reviews: