12
ENGLISH
Press and release the ESC key to exit from the above procedure.
9.2.4 Operation
The temperature blast chiller is able to manage the following types of operating cycles:
►
Positive Temperature Cooling with core probe (Par. 9.2.5)
►
Hard
Positive Temperature Cooling with core probe (Par. 9.2.6)
►
Time Positive Temperature Cooling (Par. 9.2.7)
►
Time
Hard
Positive Temperature Cooling (Par. 9.2.8)
►
Soft
Positive Temperature continuous cooling (Par. 9.2.9)
►
Freezing with core probe (Par. 9.2.10)
►
Soft
Freezing with core probe (Par. 9.2.11)
►
Time Freezing (Par. 9.2.12)
►
Time
Soft
Freezing (Par. 9.2.13)
►
Continuous
Hard
Freezing (Par. 9.2.14)
►
Precooling (Par. 9.2.15)
►
Fish Sanitization Process (Par. 9.2.18)
We suggest you to carry out the cell precooling process before each and every operating cycle; see
paragraph “9.2.15 Precooling”.
The temperature operating cycles are preceeded by a test to verify if the core probe has been inser-
ted properly; see paragraph “9.2.16 Test for checking the core probe proper insertion”.
At the end of every operating cycle the system will automatically switch to the preservation phase,
except for the continuous cooling and freezing cycles.
It is also possible to perform the following functions:
►
Switching-on of the UV- light used to sterilize the cell (optional) (Par. 9.2.17)
See following paragraphs for further information
Plase note: All cooling cycles are pre-set on Soft mode
by default so the Hard mode needs
to be selected.
Please note: all the Freezing cycles are pre-set on Hard mode
by default so the Soft mode
needs to be selected .
Please note : the Continuous Cooling and Freezing Mode
refers to cycles having an unlimi-
ted duration.