67
P52
Condenser temperature setpoint for Condenser Fan deactivation
-45
100
15
°C
P53
Hysteresis for Restart of Condenser fans
-10
10
5
°C
P54
Condenser Fans deactivation Delay from Compressor shutdown
0
300
30
Sec
General Configurations
P55
Duration of Buzzer Sound for end of cycle
0
99
3
Sec
P56
Duration of Buzzer Sound during an alarm
1
400
15
Sec
P57
Pump-Down Duration when Switching On and Off
0
999
5
Sec
P58
Base Times = 0 hours minutes ; 1 = minutes seconds
0
1
0
-
P59
Reserved
-
-
-
-
P60
Chooses Probe type 0 = NTC ; 1 = PTC
0
1
0
-
P61
Activation of Condenser Probe
0
1
1
-
Configuring the Condensation Temperature Alarm
P62
Condenser High Temperature Alarm Threshold (only if P61 = 1)
0
99
65
°C
P63
High condensation temperature alarm Hysteresis (only if P61 = 1)
0
30
10
°C
Minimum and Maximum Alarm Configuration
P64
Minimum Alarm Set for the Set-Point for Positive Storage
-99
0
0
°C
0 = alarm disabled
P65
Maximum Alarm Set for the Set-Point for Positive Storage
0
99
0
°C
0 = alarm disabled
P66
Minimum Alarm Set for the Set-Point for Negative Storage
-99
0
0
°C
0 = alarm disabled
P67
Maximum Alarm Set for the Set-Point for Negative Storage
0
99
0
°C
0 = alarm disabled
P68
Maximum and Minimum alarm Hysteresis
15
2
°C
P69
Maximum and Minimum Alarm Inhibition time from start of Storage
0
255
0
Min
P70
Maximum and Minimum Alarm Inhibition time
0
255
0
Min
HACCP Settings and printing
P71
Enable Printer
0
1
0
-
0 = disabled ; 1 = enabled
P72
Sampling Interval
0
60
15
Min
P73
Deletion of Alarms history
0
1
0
-
P74
Baud rate for PC communication
0
3
2
-
0 = 2400 ; 1 = 4800 ; 2 = 9600 ; 3 = 19200
P75
Parity for PC communication
0
2
2
-
0 = no parity ; 1 = odd ; 2 = even
P76
Address card for PC communication
1
247
1
-
Outputs configuration
P77
K6 output configuration
0 = core probe heating; 1 = defrosting resistance
0
1
1
-
Defrosting
P78
Defrosting setpoint
0
99
6
°C
P79
Defrosting differential
0
15
2
°C
P80
Defrosting duration
0
99
5
Ore
P81
Evaporator fans’ setpoint in defrosting
-40
99
-40
°C
P82
Evaporator fans’ hysteresis in defrosting
1
15
2
°C
Sanification
P83
Core probe temperature for end of sanification’s first phase
-99
99
-20
°C
P84
Room setpoint for sanification’s first phase
-99
99
-50
°C
P85
Duration of sanification’s second phase
1
99
24
Ore