7.  Annual Inspection 

 

1.

Check if nuts, bolts of mounting structure are secure and not loose. Tighten 

the loose components again, if required. 

 

2.

Check the connecting cables, grounding cables and connectors and the 

performance of the ground resistance. 

 

3.

Check all electrical and mechanical connections for freedom from corrosion. 

 

4.

Check the ground resistance of metal parts such as the module frames and 

the mounting structures.  

9.  Applicable law and dispute settlement 

 

          This “installation & Maintenance for PV modules”shall be governed by and  

          interpreted under the laws of Hong Kong (irrespective of its choice of law 

          principles). Except for the technical disputes, all disputes arising out of or in 

          connection with this “installation & Maintenance for PV Modules” shall,  

          unless amicably settled between the parties, shall be settled by arbitration in 

          Hong Kong under the Hong Kong international Arbitration Centre  

          Administered Rules in force when the Notice of Arbitration is submitted in  

          accordance with these rules. The language of arbitration shall be English. The  

          award of the Arbitrators will be final and binding upon the parties. Provided 

          that there is any inconsistency between the sale’s contracts to which this  

        “Installation & Maintenance for PV Modules” is attached, the terms and  

          conditions of the sales contract shall prevail. 

 

           This document constitutes part of the contract and valid automatically when  

           the contract is signed. 

All Rights Reserved by Eversola LuoYang Co., Ltd.     

Ref. : LYHT-INSTALLATION MANUAL    Version :OR    Updated on : 2021-06 

Summary of Contents for ES-M-Abcp Series

Page 1: ...ersola LuoYang Co Ltd No 8 2nd Jinye Road Jinping Town Yiyang County Luoyang City Henan Province 471600 P R China Customer Service hot line 86 379 68951871 HQ Fax 86 379 68951871 HQ Email services eve...

Page 2: ...ation Safety Transportation and Handling Installation Maintenance Annual Inspection Applicable Law and Dispute Settlement All Rights Reserved by Eversola LuoYang Co Ltd Ref LYHT INSTALLATION MANUAL Ve...

Page 3: ...2 cells B Series Module ESxxxM Bbcp xxx 325 340 350 375 440 460 in steps of 5W 120 cells ESxxxM Bgcd xxx 310 330 in steps of 5W 120 cells ESxxxM 24 Bbpw xxx 320 325 in steps of 5W 60 cells ESxxxP 24 B...

Page 4: ...k them surface glass side down without removeing the cardboard edge protector Step 4 Remove the cardboard edge protector from the modules before installing 03 04 5 Check the module for damage due to t...

Page 5: ...ections failure to do so may result in damage to the module Keep the connector dry and clean and do not impact external force on the connector such as heavy snow strong wind 9 The maximum modules of o...

Page 6: ...fied and mechanical load requirement For other series module fix the module with the long sides or short sides according to the bracket design and mechanical load requirement Figure 10 Fixing eight in...

Page 7: ...lation sleeve Wire cable with cross sectional area of 4mm2 10 12 AWG and ground clamp such as Tyco identification of product 1954381 2 are recommended diagrammatic sketches are as follows 17 When the...

Page 8: ...sputes arising out of or in connection with this installation Maintenance for PV Modules shall unless amicably settled between the parties shall be settled by arbitration in Hong Kong under the Hong K...

Reviews: