5700109748
|
V01-09/2021
51/ 132
Commissioning 4
Chapter Overview
This chapter outlines the initial setup of the machine.
4.1
Initial commissioning
It is imperative to read the
“1.4 General safety instructions” on page 11
manual before commissioning the machine.
Specifications for the electrical connection and the standards quoted apply for connecting
the coffee machine in EU countries. It may be necessary to also observe additional country-
specific regulations. Outside the EU, acceptance of the standards quoted is to be checked by
the legal entity or person who wishes to use the coffee machine.
The machine weighs > 50 kg, two people are required to unpack, transport and/or lift it onto
a flat stable table capable of bearing its weight.
If using a forklift, hand stacker or any other manual lifting equipment, make sure to use it
according to local regulations.
Your service organisation will put your coffee machine in operation for the first time and instruct you
on its operation.
Subsequent recommissioning, decommissioning or any service and repair operations will also be
undertaken by your service organisation.
Summary of Contents for 0E50000013
Page 1: ...E 2ct Classic E choco E 4m Classic Shotmaster m pro ST User Manual DOC 5700109748 01 09 2021 ...
Page 44: ...2 Description 44 132 Enigma User Manual Eversys S A PAGE INTENTIONALLY LEFT BLANK ...
Page 50: ...3 Software 50 132 Enigma User Manual Eversys S A PAGE INTENTIONALLY LEFT BLANK ...