5782ENC-H264HD-IPASI
Professional Contribution H.264 and MPEG-2 Encoder
Page - 46
Revision 1.0
A window will appear, as shown in Figure 6-2. Navigate to the location of the new JAR file and double
click to select the file. The window will automatically close and the update will be applied in the
background.
Figure 6-2: VistaLINK
®
PRO – Applying JAR Updates
You will be prompted to restart the server to enable the change to take effect. Apply as many JAR
updates as required before restarting the server.
NOTE: You may confirm that all updates have been successfully applied by
selecting from the menu Tools>View>Show/Hide Product update log.
Shutdown the server by selecting from the menu:
File>Shutdown Server
. Now re-open the server, it is
normal for the start up to take marginally longer while each individual update is being applied. Once
complete, you may restart the VLPro Clients. As the Client restarts you will experience a short delay
while the update is applied. A prompt will appear confirming that the updates have been applied.