5. Place the Ballast Weight on top of the Base Rail, lining up the
two pairs of holes, and insert the tips of the screws through
the two pairs of holes. Orient both loop clamps so that they
point “straight out” away from the Rail (
E
).
6. Turn the screws into place with
#2
, the Torx L-wrench (
F
). Al-
ternate between the two screws until both are tight.
7. Slip the Long Motor Wire Harness
#12
, through both loop
clamps in the direction shown (
G
). With the loop clamps point-
ing towards you, the connector should end up on the RIGHT
end of the Base Rail.
F
E
Tip: You may find it easiest to start the screws on the
“long” end of the wrench and then tighten them with the
short end (shown).
G
§2.2 Ballast Weight, continued
11
Summary of Contents for AxiDraw MiniKit 2
Page 5: ...Part 1 Tools 5...
Page 8: ...Part 2 The Base 8...
Page 20: ...Part 3 The X Carriage 20...
Page 35: ...Part 4 Y Belt and Z 35...
Page 55: ...Part 5 Servo and wiring 55...