2
2551988C
Safety instructions
The Evinox heating/cooling interface unit must be installed, commissioned and maintained by a
qualified and competent personnel in accordance with this document as well as national regulations
and standards.
Risk of Electric shock.
Disconnect the electricity supply before starting any works on the unit.
Qualified personnel.
Electrical installation must only be carried out by technical personnel. .
In the case of water leak.
Slowly close the isolation valve at the top of the unit
Contact Evinox Energy
Maintenance requirements
We recommend the unit is checked at least every 24 months by an
authorised maintenance
engineer. If the unit is subject to excessively heavy usage or non domestic installations (for example
in a light commercial environment), we recommend having it checked more than every 24 months.