174
FUEL SYSTEM
FUEL COMPONENT SERVICING
Place gasket on throttle body. Install throttle body
on reed plate and install screws.
Tighten the center screws first and expand out-
ward. Final torque is 60 to 120 in. lbs. (7 to 13.5
N·m).
Install upper main bearing vent hose and secure
with tie strap.
Connect throttle linkage and electrical connectors.
IMPORTANT:
Refer to
p. 143.DO NOT lubricate throttle linkages.
002329
Summary of Contents for E75DPLSCB
Page 1: ...2008 SC E TEC 75 90 P N 5007527 75 90 HP 5007527 Service Manual ...
Page 2: ......
Page 231: ...POWERHEAD POWERHEAD VIEWS 229 11 POWERHEAD VIEWS Port Short Block Starboard Short Block ...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS Port Dressed Powerhead Starboard Dressed Powerhead ...
Page 233: ...POWERHEAD POWERHEAD VIEWS 231 11 Front ...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS Rear ...
Page 235: ...POWERHEAD POWERHEAD VIEWS 233 11 Top ...
Page 302: ...S 2 ...
Page 349: ...2008 SC E TEC 75 90 P N 5007527 75 90 HP 5007527 Service Manual ...