285
GEARCASE
GEARCASE ASSEMBLY
13
“O” Type Gearcases
Loosen retainer screws 1/4 turn.
Install wedge, screw, and washer. Apply
Ultra
Lock
to threads and tighten screw to a torque of
15 to 20 in. lbs. (1.7 to 2.3 N·m).
Re-tighten two retainer screws to 18 to 20 ft. lbs.
(24 to 27 N·m).
Confirm that torque on the wedge screw is 15 to
20 in. lbs. (1.7 to 2.3 N·m).
To complete gearcase assembly, refer to:
•
•
•
•
GEARCASE REMOVAL AND INSTALLA-
TION
•
•
Propeller Hardware Installation
•
During break-in period of a reassembled gear-
case, change the gearcase lubricant between 10
to 20 hours of operation.
DSM02291
DSC02361
Summary of Contents for E75DPLSCB
Page 1: ...2008 SC E TEC 75 90 P N 5007527 75 90 HP 5007527 Service Manual ...
Page 2: ......
Page 231: ...POWERHEAD POWERHEAD VIEWS 229 11 POWERHEAD VIEWS Port Short Block Starboard Short Block ...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS Port Dressed Powerhead Starboard Dressed Powerhead ...
Page 233: ...POWERHEAD POWERHEAD VIEWS 231 11 Front ...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS Rear ...
Page 235: ...POWERHEAD POWERHEAD VIEWS 233 11 Top ...
Page 302: ...S 2 ...
Page 349: ...2008 SC E TEC 75 90 P N 5007527 75 90 HP 5007527 Service Manual ...