1. You are now going to install the air valve control
box onto the inlet cover on your Nexus. Position this
box so the “Power” and “Air To Bio-Chamber” outlets
face the main control box, as shown.
500mm
Air line
2. Remove the lid off the Air Valve Control Box by
unscrewing the 4 screws in each corner of the box
to allow access to fixing locations.
NOTE: Keep the
4 screws and O-Rings safe for re-fitting later.
3. Place the Air Valve Control Box as shown.
Make sure the air line to the Eazy sits between the
Actuator and the stainless steel plate on the inlet
valve assembly.
4. To fit the Air Valve Control Box in this position,
drill 4 pilot holes using the 3mm drill bit through the
4 plastic panels in the base of the box.
INSTALLING THE AIR VALVE CONTROL BOX
14
Inlet valve
only installed
on Gravity Fed
set-ups.