Page
22
cemented, screwed, or flanged
– should be made while the pipe is held in a temporary support.
Once the joints have been completed, the final clamping can be completed. When correctly
installed, a clamp, holder, or pipe connection can be loosened or removed without the pipeline
shifting position.
Recommended Support Spacing (In Feet)
Nominal
Pipe
Size
(inches)
PVC Pipe
CPVC Pipe
Schedule 40
Schedule 80
Schedule 80
Temperature (°F)
Temperature (°F)
Temperature (°F)
60
80
100
120
60
80
100
120
60
80
100
120
Recommended Support Spacing (feet)
1
5.5
5
4.5
3
6
5.5
5
3.5
6.5
6.5
6
5
2
6
5.5
5
3.5
7
6.5
6
4
7.5
7.5
7
6
3
7
7
6
4
8
7.5
7
4.5
8.5
8
7.5
4.5
4
7.5
7
6.5
4.5
9
8.5
7.5
5
9.5
8
8
5
6
8.5
8
7.5
5
10
9.5
9
6
10.5
10
9.5
9
8
9
8.5
8
5
11
10.5
9.5
6.5
11
10.5
10
9.5
10
10
9
8.5
5.5
12
11
10
7
11.5
11.5
11
10.5
12
11.5
10.5
9.5
6.5
12
11
10
7
12.5
12.5
12.5
11
14
12
11
10
7
13.5
13
11
8
16
12.5
11.5
10.5
7.5
14
13.5
11.5
8.5
Summary of Contents for DEFENDER SP-27-48-487
Page 14: ...Page 14 General Installation Schematic ...
Page 15: ...Page 15 DIMENSIONAL REFERENCE Standard Defender ...
Page 16: ...Page 16 Assero Defender Reduced Height Defender ...
Page 17: ...Page 17 Reduced Height Defender ...
Page 77: ...Page 77 APPENDIX ...
Page 78: ...Page 78 Electrical Schematic ...
Page 79: ...Page 79 Head Loss Curve ...