E-80-136KTL User Manual
Copyright ©EVOLVE ENERGY GROUP CO.,LTD
- 38 -
STEP 6
:
Depending on the grid configuration, connect L1, L2, L3 and N to the
terminals according to the label and tighten the screw on the terminal using a
screwdriver.
Note
:
⚫
Phase lines use M12 terminal connector, PE line use M8 terminal connector.
The position of
“
PE
”
Line and
“
N
”
Line should not be opposite. Opposite
position may cause inverter permanently faulty
⚫
As shown in the figure below, for HV model, the N-wire does not need to be
connected. (HV model:100KTL-HV,125KTL-HV,136KTL-HV)