E-80-136KTL User Manual
Copyright ©EVOLVE ENERGY GROUP CO.,LTD
- 44 -
Procedure
:
①
②
③
④
⑤
6.
Commissioning of inverter
Outlines this Chapter
Introduce E- 75-136KTL safety inspection and start processing
6.1.
Cable Connection Inspection
For first time operation, check the AC voltage and DC voltage
are within the acceptable range
Attention
AC grid connection