E-80-136KTL User Manual
Copyright ©EVOLVE ENERGY GROUP CO.,LTD
- 15 -
4.
Installation
Outlines of this Chapter
This topic describes how to install this product, please read carefully before
install.
Do NOT install the product on flammable material
Do NOT store this product in potentially explosive atmospheres
Dangers
The enclosure and heat sink will get hot during operation, please
do not mount the product at easy to reach location
Caution
Consider the weight of this product when transport and moving
Choose an appropriate mounting position and surface
At least two persons for installation
Attention
4.1.
Installation Process
4.2.
Checking Before Installation
Checking Outer Packing Materials
Before unpacking, please check the condition of the outer package materials if any
damage found, such as holes, cracks, please not unpack the product, contact your
distributor immediately. Recommend installing the product within 24 hours after
unpacking the package.