Design and function
Intermediate hose package connection
099-005593-EW501
10.01.2022
23
Figure 5-5
Item Symbol Description
0
1
Power source
2
Intermediate hose package
3
Power source welding current connector plug
Welding current connection between power source and wire feeder
4
Connection thread - G¼"
Shielding gas connection (inlet)
5
Quick connect coupling (red)
coolant return
6
7-pole connection socket (digital)
• Control lead for wire feed unit
7
Quick connect coupling (blue)
coolant supply
8
Safety belt
Intermediate hose package strain relief
• Secure hose package end with the strain relief.
• Push the welding current cable socket onto the “welding current connecting plug” and lock by turning
to the right.
• Screw the gas hose connection to the shielding gas connection (inlet) on the machine gas-tight.
• Insert cable plug on the control lead into the 7-pole connection socket and secure with crown nut (the
plug can only be inserted into the connection socket in one position).
• Lock connecting nipples of the cooling water tubes into the corresponding quick connect couplings:
Return line red to quick connect coupling, red (coolant return) and
supply line blue to quick connect coupling, blue (coolant supply).