INSTALLATION
1
2
Connecting several condensate sources to one drain device causes operating problems (3).
Make sure that each drain source has its own drain device (4).
After installation or maintenance, the test button should be pressed to empty condensate
that has been collected while the ball valve has been closed..
ELECTRICAL INSTALLATION
Cut the wires as shown below:
L - Phase
N - Neutral
PE - Protective
Earth
6,5 cm
5,0 cm
10,0 cm
The electrical connection should be realised as shown on pictures above, depending on
orientation of the cover.
Outlet
connection
Electric mains
connection
– 12 –
Summary of Contents for 5370.100
Page 16: ......