background image

4.4.1 Check the specified type and all accessories of the closure
4.4.2 Fix the closure to the fixing bracket
4.4.3 Open the fibre closure
Loosen the bolts and open the closure

4.5.1 Necessary components for removing jacket of cables with uncut fibre

Loosen all the hexangular bolts installed at the 
bottom of the base.

Remove all screws from the required cable 
clamps.

Note. Please be careful when opening the enclosure so as not to damage the seal.

4.5 Installation of cable into the enclosure

4.5 The inlet of uncut cables

Number

Name

Quantity

Material

Application

1

Base

1

ABS+PC

Fixing cable

2

Two-hole seal ring

1

Vulcanized rubber

For sealing uncut fibre

3

Two-hole pressed button gland

1

ABS+PC

4

M6×30 hexangular bolts

1

Stainless steel 

Summary of Contents for 208-504

Page 1: ...ounting especially used for FTTH fibre distribution We are always in pursue of doing research and developing the telecommunication connection equipment Our FOSC is your reliable choice to guarantee th...

Page 2: ...tion fixtures 1 set Fixing FOSC 11 Data paper 1 piece Fibre labeling 12 Insulation tape 1 piece 13 Protective tube 1 piece Fibre protection 14 Plastic block 3 For ports when not used 15 Hexagonal span...

Page 3: ...forced core about 4cm from the removing point on the sheath NOTE 1 Be sure not to damage fibre 2 Do not use any damaged cable 3 While removing the cable sheath please do not cut twist or damage cable...

Page 4: ...gular bolts installed at the bottom of the base Remove all screws from the required cable clamps Note Please be careful when opening the enclosure so as not to damage the seal 4 5 Installation of cabl...

Page 5: ...eeded in the installation of cut cable 4 6 2 4 Store the spare cable in the closure Be careful not to damage the fibre Fasten the M6x30 bolts using the allen key provided Please fasten them carefully...

Page 6: ...levant cable port and fasten the bolts by using the spanner 4 7 3 Cable sealing 4 8 1 All the components needed This FOSC is suitable for the patch cord 2 2 0 one end pigtail 4 8 2 All the components...

Page 7: ...te fibre to the splice area allowing extra length for reworking 4 9 3 Repeat the same steps above 4 9 4 Please embed the fibre splice protective tube subsequently into the deck Repeat the above steps...

Page 8: ...the closure with M6x12 hexagonal bolts and M4x15 bolts 4 11 1 2 Choose the place to install and then install M10 bolts in 65mm 4 11 1 3 Fix the closure on the wall 4 11 2 Aerial mounting installation...

Page 9: ...e proof and earthquake proof The accessories are packed first plastic bags then into the boxes with plastic bags for sealing There are moisture proof and earthquake direction signs outside the boxes I...

Reviews: