4.9.5 Install the tray after the splicing
4.9.6 Cable sealing
Insert the fixtures to the relative cable port one after another and then fasten the bolts with a spanner.

5.10.1 After the installation of cables, secure the cover and then tighten the bolts by using the spanner properly (less than 50N).
5.10.2 Fibre test and sealing test

4.11.1 Wall-mounting
4.11.1.1 Fix the hoop on the closure with M6x12 hexagonal bolts and M4x15 bolts.
4.11.1.2 Choose the place to install and then install M10 bolts in 65mm.
4.11.1.3 Fix the closure on the wall

4.11.2 Aerial-mounting installation
4.11.2.1 Fix the hoop on the closure with M6×12 hexagonal bolts and M4×15 bolts.
4.11.2.2 Fix the aerial hook through the connecting bar
4.11.2.3 Fix the bar through the hook on the strand

You can insert the air to test after the sealing of the closure and do the protection of cable. (Your choice to have a valve or no 

valve)

4.10 Assemble the closure

4.11 Installation of FOSC

Summary of Contents for 208-504

Page 1: ...ounting especially used for FTTH fibre distribution We are always in pursue of doing research and developing the telecommunication connection equipment Our FOSC is your reliable choice to guarantee th...

Page 2: ...tion fixtures 1 set Fixing FOSC 11 Data paper 1 piece Fibre labeling 12 Insulation tape 1 piece 13 Protective tube 1 piece Fibre protection 14 Plastic block 3 For ports when not used 15 Hexagonal span...

Page 3: ...forced core about 4cm from the removing point on the sheath NOTE 1 Be sure not to damage fibre 2 Do not use any damaged cable 3 While removing the cable sheath please do not cut twist or damage cable...

Page 4: ...gular bolts installed at the bottom of the base Remove all screws from the required cable clamps Note Please be careful when opening the enclosure so as not to damage the seal 4 5 Installation of cabl...

Page 5: ...eeded in the installation of cut cable 4 6 2 4 Store the spare cable in the closure Be careful not to damage the fibre Fasten the M6x30 bolts using the allen key provided Please fasten them carefully...

Page 6: ...levant cable port and fasten the bolts by using the spanner 4 7 3 Cable sealing 4 8 1 All the components needed This FOSC is suitable for the patch cord 2 2 0 one end pigtail 4 8 2 All the components...

Page 7: ...te fibre to the splice area allowing extra length for reworking 4 9 3 Repeat the same steps above 4 9 4 Please embed the fibre splice protective tube subsequently into the deck Repeat the above steps...

Page 8: ...the closure with M6x12 hexagonal bolts and M4x15 bolts 4 11 1 2 Choose the place to install and then install M10 bolts in 65mm 4 11 1 3 Fix the closure on the wall 4 11 2 Aerial mounting installation...

Page 9: ...e proof and earthquake proof The accessories are packed first plastic bags then into the boxes with plastic bags for sealing There are moisture proof and earthquake direction signs outside the boxes I...

Reviews: