background image

MF1501/08/18

4.11.3 Pole-mounting installation

•  Airproof performance: airing pressure inside box 100Kpa, pointer immovability after 24 hours or no air bell  within 15min when    

placed under normal temperature water.

•  Re-encapsulation performance: no change in the index of air-proof performance after three times of repeat encapsulation.

•   Insulation resistance: ≥2×104MΩ

•   Voltage-resistance strength: under the effect of 15KVDC/1min, non-puncture, no arc-over

4.11.3.1 Fix the hoop on the concrete pole with the M6×12 screw, then tighten the nut.
4.11.3.2 Fix the closure and tighten the nut.

This equipment packaging is moisture-proof and earthquake-proof. The accessories are packed first plastic bags, then into the 

boxes with plastic bags for sealing. There are moisture-proof and earthquake direction signs outside the boxes.
It can’t be inverted in the transportation and be free from rolling when carrying. Please load carefully and prevent the collision. 

You should prevent it from heavy rain before installation. The temperature in the transportation should be controlled between 

-35 

º

C to +55 

º

C.

The excessive accumulation of goods should not be stored on the cartons. The Treasury should away from the erosion of corrosive 

gas equipment and the temperature should be below 45 

º

C  and higher than -5 

º

C, and relative temperature should not be high in 

long-term (generally less than 75%)

5. Main Technical Data

6. Packing, Transportation and Storage

Summary of Contents for 208-504

Page 1: ...ounting especially used for FTTH fibre distribution We are always in pursue of doing research and developing the telecommunication connection equipment Our FOSC is your reliable choice to guarantee th...

Page 2: ...tion fixtures 1 set Fixing FOSC 11 Data paper 1 piece Fibre labeling 12 Insulation tape 1 piece 13 Protective tube 1 piece Fibre protection 14 Plastic block 3 For ports when not used 15 Hexagonal span...

Page 3: ...forced core about 4cm from the removing point on the sheath NOTE 1 Be sure not to damage fibre 2 Do not use any damaged cable 3 While removing the cable sheath please do not cut twist or damage cable...

Page 4: ...gular bolts installed at the bottom of the base Remove all screws from the required cable clamps Note Please be careful when opening the enclosure so as not to damage the seal 4 5 Installation of cabl...

Page 5: ...eeded in the installation of cut cable 4 6 2 4 Store the spare cable in the closure Be careful not to damage the fibre Fasten the M6x30 bolts using the allen key provided Please fasten them carefully...

Page 6: ...levant cable port and fasten the bolts by using the spanner 4 7 3 Cable sealing 4 8 1 All the components needed This FOSC is suitable for the patch cord 2 2 0 one end pigtail 4 8 2 All the components...

Page 7: ...te fibre to the splice area allowing extra length for reworking 4 9 3 Repeat the same steps above 4 9 4 Please embed the fibre splice protective tube subsequently into the deck Repeat the above steps...

Page 8: ...the closure with M6x12 hexagonal bolts and M4x15 bolts 4 11 1 2 Choose the place to install and then install M10 bolts in 65mm 4 11 1 3 Fix the closure on the wall 4 11 2 Aerial mounting installation...

Page 9: ...e proof and earthquake proof The accessories are packed first plastic bags then into the boxes with plastic bags for sealing There are moisture proof and earthquake direction signs outside the boxes I...

Reviews: