51 / 66
6) Feed the lifting chain through the new lift hooks pulley. Make sure the chain is not twisted (see
figure 35).
Figure 35:
“Replacement of the Chain hook”
7) Re-connect the chain to the aluminum frame block (see figure 36).
Figure 36:
“Re-applying of the frame block”
8) Run the chain minimum 2 meter through the lift hook to ensure good operation.