EtherSAM Test Setup and Results
NetBlazer
53
Ramp Configuration
Dynamic Ramp
The graphic displays the percentage of each CIR level step in time.
Step Time
The step time represents the test duration for each ramp step (from 5 to 60
seconds).
Ramp Duration
The ramp duration indicates the total time required to perform all the ramp
steps for each service.
Add Step
Add button allows to add a new ramp step. To add a new ramp step, press
the
Add
button and enter the CIR percentage.
Note:
Maximum of 7 pre CIR steps can be added in the Ramp configuration.
Note:
The step is added in terms of % of CIR.
Summary of Contents for FTB-860
Page 7: ...NetBlazer vii B Glossary 371 Acronym List 371 VLAN 379 1588 PTP 380 SyncE 385...
Page 12: ......
Page 16: ......
Page 20: ......
Page 30: ......
Page 84: ......
Page 110: ......
Page 122: ......
Page 152: ......
Page 166: ......
Page 182: ......
Page 192: ......
Page 224: ......
Page 366: ......
Page 376: ......
Page 382: ...Specifications 370 FTB 860 880 Straight Through Cable 1000 Mbit s Crossover Cable 1000 Mbit s...