RFC 2544 Test Setup and Results
NetBlazer
75
Configuring an RFC 2544 Test
Note:
At least one of the RFC 2544 test procedures (
Throughput
,
Back-to-Back
,
Frame Loss
, or
Latency
) has to be enabled to start the test. Test
procedures, those that are enabled will be performed following this order:
Throughput, Back-to-Back, Frame Loss, and Latency.
To configure the RFC 2544 Dual Test Set (DTS) test:
1.
From the
Test
menu, press
Setup
.
2.
From the
Test Applications
tab, press
RFC 2544
.
3.
From the
Interface
tab, configure the
Port
,
Network
settings, and view
the information on the
SFP/SFP+
page. See
Ensure that the link is up in the status bar before proceeding to the next
step.
4.
Press the
Global
tab and configure the global settings. See
5.
From the
Global
tab, enable
Dual Test Set
.
6.
Select Mode as
Local
.
7.
Press the
Discover Remote
button to scan the IP address of remote
unit and press the
Connect
Note:
Subtests
and
MAC/IP/UDP
pages are not available when the Dual Test Set
Mode
is set to
Remote
.
8.
Press the
Subtests
tab and setup each subtest. See
9.
Press the
MAC/IP/UDP
tab. Configure the stream settings. See
Summary of Contents for FTB-860
Page 7: ...NetBlazer vii B Glossary 371 Acronym List 371 VLAN 379 1588 PTP 380 SyncE 385...
Page 12: ......
Page 16: ......
Page 20: ......
Page 30: ......
Page 84: ......
Page 110: ......
Page 122: ......
Page 152: ......
Page 166: ......
Page 182: ......
Page 192: ......
Page 224: ......
Page 366: ......
Page 376: ......
Page 382: ...Specifications 370 FTB 860 880 Straight Through Cable 1000 Mbit s Crossover Cable 1000 Mbit s...