Creating and Starting a Test Case
Ethernet and Fibre Channel Application
71
Introducing the Test Setup
Steps
Available with
The
Test
step is the root of the test case. It allows the configuration
of the test name, test application type, Interface Type, topology, and
Clock Mode. For RFC 2544, the selection of the sub tests and dual
test set are also available.
All tests
The
Port
step allows the selection and configuration of the physical
port and for 10Gig-E interface the configuration of the transceiver
mode (LAN or WAN). For WAN transceiver mode, the WIS step will
be inserted in front of the Framing step.
All tests
The
WIS
step indicates that the WAN transceiver mode is selected.
Available with 10Gig-E interface only.
WAN
transceiver
mode only
The
Framing
step allows the selection of the test framing layer.
All tests
The
Network
step allows the selection of the network
Ethernet/Fibre Channel parameters for the port.
All test at the
exception of
BERT
Unframed
,
Framed Layer1
and Fibre Channel
The
Traffic Stream
step allows traffic stream configuration.
All Ethernet tests
except
Smart Loopback
The
Remote Module
step allows the selection of a remote
compatible module (IQS-8510B, IQS-8510G, IQS-8525/IQS-8535,
IQS-8120NGE/IQS-8130NGE, and RTU-310/RTU-310G).
EtherSAM
and
RFC 2544
Dual
Test Sets
tests
only
The
Pattern
step allows the selection of the pattern.
BERT
test only