Setting Up Copper Tests
92
MAX-635G
FED Control
FED Control
FED Control
is an option enabled feature that tells the test set to detect
and control the Teletech TS125 or Viavi UltraFED
IIB remote FED (far end
device) during testing.
Pair Detective
,
Auto Test
, and many manual tests
will automatically detect and control the FED when this option is enabled,
saving you multiple trips to the far end after it is initially placed on the line.
The FED should always be connected to ground as well as the P.U.T. (pair
under test).
By connecting the T-R-G/A-B-E of a customer’s pair (CPE) to the
customer
side of the FED (blue labeled connectors; the red labeled connectors are
connected to CO/Exchange side of the pair for pass-through mode),
control signals are sent to the FED by the MaxTester in order to open/short
(or pass through to the CO/Exchange) the T-R-G/A-B-E connections.
Connect T-R-G/A-B-E as follows for each FED state:
1.
For
Pass Through
/
Exchange Connect
, connect the T-R/A-B wires to
the blue-labeled Pair1-Cu connectors on the FED (customer side), and
the network side T-R/A-B to the red-labeled Pair1 Ex-CO connectors
towards the CO/Exchange.
Summary of Contents for MAX-635G
Page 1: ...User Guide Copper and G fast VDSL2 ADSL2 Multi play Test Set MAX 635G www EXFO com ...
Page 10: ......
Page 26: ......
Page 162: ......
Page 218: ......
Page 270: ...TDR 260 MAX 635G Continuous Examples of Common Faults Short Fault ...
Page 271: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 261 Continuous Open ...
Page 272: ...TDR 262 MAX 635G Continuous Bridged Tap ...
Page 273: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 263 Continuous Splice Joint ...
Page 274: ...TDR 264 MAX 635G Continuous Peak Function ...
Page 275: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 265 Continuous Dual Trace View ...
Page 276: ...TDR 266 MAX 635G Continuous Load Coil ...
Page 290: ......
Page 336: ......
Page 414: ......
Page 424: ......
Page 432: ......
Page 438: ......
Page 444: ......