Setting Up DSL/IP Tests
Copper and G.fast/VDSL2/ADSL2+ Multi-play Test Set
343
Test Setup
Communication Channel
is the parameter based on either
UDP
or
TCP
.
Controller Setup
button opens a new page that allows you to set the
required VoIP parameters for the unit.
Proxy Setup
button opens a new page that allows you to set
parameters for the Proxy.
Clone Data WAN
(only available in
Manual Test
Setup
) allows you to add the WAN configuration
from the
Connection Setup
tab to this test, by
selecting
Yes
. If you select
No
, all the parameters
from the
Connection Setup
page, beginning with
Access Mode
, are listed and can be modified.
One additional
Access Mode
,
Bridged (DHCP)
can be configured here in the VoIP WAN setup, to
support the modem in bridge mode and WinCE in
DHCP. This allows WinCE to get the WAN IP
address via DSL connection through the modem's
bridge.
Bridged (DHCP)
uses same parameters
as
DHCP
mode.
To configure test setup values:
1.
Press the up/down arrow keys to select the desired parameter.
2.
Press the left/right arrow keys to view and select the options.
OR
3.
Press
on a value to open a list box of options or the alphanumeric
editor screen and use the navigation keys to scroll through.
4.
Press
to confirm the value.
5.
If you make any changes to the parameter values, you will be
prompted to save changes done in Profile. Press the on-screen function
keys to save or cancel your input.
Summary of Contents for MAX-635G
Page 1: ...User Guide Copper and G fast VDSL2 ADSL2 Multi play Test Set MAX 635G www EXFO com ...
Page 10: ......
Page 26: ......
Page 162: ......
Page 218: ......
Page 270: ...TDR 260 MAX 635G Continuous Examples of Common Faults Short Fault ...
Page 271: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 261 Continuous Open ...
Page 272: ...TDR 262 MAX 635G Continuous Bridged Tap ...
Page 273: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 263 Continuous Splice Joint ...
Page 274: ...TDR 264 MAX 635G Continuous Peak Function ...
Page 275: ...TDR Copper and G fast VDSL2 ADSL2 Multi play Test Set 265 Continuous Dual Trace View ...
Page 276: ...TDR 266 MAX 635G Continuous Load Coil ...
Page 290: ......
Page 336: ......
Page 414: ......
Page 424: ......
Page 432: ......
Page 438: ......
Page 444: ......