Maintenance
Adjustments
Note:
Disengage PTO, shut off engine, wait for
all moving parts to stop, engage parking brake, and
remove key before servicing, cleaning, or making any
adjustments to the unit.
CAUTION
Raising the mower deck for service or
maintenance relying solely on mechanical
or hydraulic jacks could be dangerous. The
mechanical or hydraulic jacks may not be enough
support or may malfunction allowing the unit to
fall, which could cause injury.
Do Not rely solely on mechanical or hydraulic
jacks for support. Use adequate jack stands or
equivalent support.
Deck Leveling
1. Position the mower on a flat surface.
2. Stop engine, wait for all moving parts to stop, and
remove key. Engage parking brake.
3. Check the tire pressure in the drive tires. Proper
inflation pressure for tires is 13 psi (90 kPa).
Adjust if necessary.
4. Position the transport lock in the latching
position.
5. Push the foot pedal all the way forward and
the deck will latch at the 4 1/2 inch (11.4 cm)
transport position (Figure 26).
Figure 26
1.
Foot lever
3.
Transport lock
2.
Height of cut pin
6. Insert the height adjustment pin into the 3 inch
(7.6 cm) cutting height location.
7. Release the transport lock and allow the deck to
lower to the cutting height.
8. Raise the discharge deflector.
9. Measure from the level surface to the front tip of
the center blade. The measurement should read
3 inches (7.6 cm).
Note:
In most conditions, the back tips on the
side blades should be adjusted 1/4 inch (6.4 mm)
higher than the front.
38
Summary of Contents for LAZER Z E-SERIES Operators
Page 1: ...LAZER Z E SERIES For Serial Nos 312 000 000 Higher Lazer Z LZE Units Part No 4501 202 Rev A ...
Page 53: ...Schematics Hydraulic Diagram 53 ...
Page 55: ...Notes 55 ...
Page 56: ...Notes 56 ...
Page 57: ...Service Record Date Description of Work Done Service Done By 57 ...
Page 58: ...58 ...