Operation
3. To remove the bags, shut off deck drive, stop
the engine and wait for all moving parts to stop.
Open the hood and remove the bags by lifting up
on the rear of the bag, then unhooking the front
clip. Empty bags by inverting them.
4. Reinstall bags, close and latch the hood before
continuing mowing.
Tips for mowing conditions:
•
When mowing in areas with sandy soil, use
low lift blades on the cutting deck and higher
cutting heights to minimize wear on the blower
components.
•
When mowing in wet conditions, such as just after
a rain or in heavy dew, use low lift blades on the
cutting deck to minimize plugging of the blower.
•
Maintaining a ground speed that does not pull
down the engine RPM will allow for the highest
productivity and best quality of cut. Bogging the
engine RPM down by going too fast will cause
plugging and quality of cut issues.
•
When the bags get full, the sound of the blower
will change and there will be slight blowout from
the front right corner of the deck. Emptying the
bags at this point will minimize the potential for
the tube to plug.
•
For units below SN 600,000:
Anti-blowout
kits are available for leaf collection. They help
to prevent “chasing” the leaves. To reduce
“plowing” leaves, raise the deck slightly.
•
On Triton:
Raise front adjustable baffle to
reduce plowing. Lowering front adjustable baffle
may prevent “chasing”. Match discharge opening
to Ultra Vac intake for best performance.
Bagger Removal for Side Discharge
1. Shut off the deck drive, stop engine and wait for
all moving parts to stop. Remove key.
2. Remove the discharge tube by releasing the
latches at the blower. Slide the tube off the blower
outlet and remove the upper end from the hood.
Figure 5
1.
Hood
4.
Hairpin
2.
Blower
5.
Clevis Pin
3.
Tube
6.
Bag
3. Remove the belt cover by loosening the knobs
(see Figure 6).
Figure 6
1.
Chute Pivot Pin
5.
Belt
2.
Knob
6.
Belt Cover
3.
Discharge Chute
7.
Deck Sheave
4.
Hairpin
12
Summary of Contents for LAZER Z HP Series
Page 21: ...Notes 21 ...
Page 22: ...Service Record Date Description of Work Done Service Done By 22 ...
Page 23: ...23 ...