Operation
See the decal on the top of the deck lift plate for
cut heights.
5. Push the foot lever forward, pull up on the
transport lock knob and let the deck lower
down to the predetermined cut height by slowly
decreasing foot pressure allowing the foot lever
to travel rearward.
Adjusting the Anti-Scalp Rollers
It is recommended to change the anti-scalp roller
position, when the height of cut has changed.
1. Stop the machine and move the motion control
levers outward to the neutral locked position.
2. Disengage the PTO.
3. Engage the park brake.
4. Stop the engine, remove the key and wait for all
moving parts to stop.
5. After adjusting the height of cut, adjust the
anti-scalp rollers by removing the mounting
hardware.
6. Place the rollers in one of the positions shown
(Figure 17). Rollers will maintain 3/4 inch (19
mm) clearance to the ground to minimize gouging
and roller wear or damage.
Figure 17
For cutting heights above 3.5 inches (90 mm) use the
bottom hole. The rollers will still be effective against
scalping.
1.
Anti-scalp roller
mounting bracket
2.
Cutting height
For Maximum Deck Flotation,
place the rollers
one hole position lower. Rollers should maintain
1/4 inch (6.4 mm) clearance to the ground.
Do
Not
adjust the rollers to support the deck.
7. Reinstall the mounting hardware.
•
Side Discharge Units:
A. Be sure the roller bolts are installed with
the spring disc washer between the head
of the bolt and the mounting bracket (see
Figure 18).
B. Torque the 3/8 nyloc nut to 50–55 ft-lb
(68-75 N-m).
Figure 18
1.
3/8-16 X 3 3/4 inch
Grade 8 bolt
3.
Front right anti-scalp
bracket shown
2.
Spring disc washer
(cone towards bolt head)
4.
3/8 inch nyloc-torque to
50-55 ft-lb (68-75 N-m)
31
Summary of Contents for RADIUS
Page 1: ...RADIUS For Serial Nos 400 000 000 Higher Part No 4502 907 Rev B ...
Page 73: ...Schematics Schematics Electrical Logic Schematic Exmark Engine 73 ...
Page 74: ...Schematics Electrical Logic Schematic Kohler Engine 74 ...
Page 75: ...Schematics Electrical Logic Schematic Kawasaki Engine 75 ...
Page 79: ...Notes 79 ...
Page 80: ...Notes 80 ...
Page 81: ...Service Record Date Description of Work Done Service Done By 81 ...
Page 82: ...82 ...