Operation
g189941
Figure 10
1.
Nut
2.
Belt guide
13.
Mount the blower on the deck by inserting the
mounting pin into the tube welded to the rear
corner of the deck (see Figure 11). Pivot the
blower until the front pin engages the slot in
the deck. Adjust the position of the front pin if
necessary to engage the slot. Use the latch to lock
the blower in this position. Adjust the tension on
the latch to hold the blower up to the deck, yet
allow for release by hand.
g189943
Figure 11
1.
Slot
4.
Mounting pin
2.
Front pin
5.
Deck tube
3.
Blower latch
Pull the spring loaded idler release handle back
and install the belt in the upper groove of the
top spindle sheave. The belt should be routed as
shown in Figure 12.
g189695
Figure 12
View from Top of Blower
1.
Spring loaded idler
3.
Fixed idler
2.
Impeller sheave
4.
Deck sheave
14.
Position the belt cover at an angle and slide it
under the mower frame (see Figure 13).
g037117
Figure 13
1.
Blower
3.
Mower frame
2.
Belt cover
15.
Push down on the back of the cover and slide it
backwards under the blower.
16.
Slide the belt cover forward until it is seated under
both lips on the deck.
14
Summary of Contents for ULTRAVAC BAGGER 126-6954
Page 21: ...Notes 21 ...
Page 22: ...Notes 22 ...
Page 23: ...Service Record Date Description of Work Done Service Done By 23 ...